Skip to main content
OERK

King Khaled Intl

A Journey Through Time

1983 — 2024

1980s
1983

King Khalid International Airport opened on 14 November 1983, designed by the architectural firm HOK. Its four terminals are arranged around a central mosque accessible to all passengers.

2010s
2016

Terminal 5 (the dedicated Royal Terminal) was expanded and a new General Aviation terminal opened, reflecting Saudi Arabia's growing private aviation sector.

2020s
2024

Construction began on the King Salman International Airport, a massive new facility designed by Foster + Partners. It will eventually replace King Khalid with capacity for 120 million passengers.

Present
Contribute a Historical Fact
0 / 2,000
A link to a reliable source verifying this fact (must be HTTPS).